The CIL plant location was chosen because of its proximity to existing infrastructure, significantly reducing operating costs. Existing equipment makes it easier to integrate and optimise the processing project.
Location of ore deposits for the CIL project
Key Deposits
The CIL project will process ore from multiple deposits across the Karma complex, including Nami (oxide ore), GG2, GG1, Kao, and Goulagou deposits.
12-year production schedule with three main ore sources
Key Metrics
The project will process ore from Nami (3 years), GG2 (4 years), and GG1 (5 years) with varying grades and capacities.
Technical design of the CIL heap leaching operation
Key Features
The CIL process includes oxide ore extraction from Nami, grinding and concentration, followed by heap leaching and gold recovery.
14-month execution timeline with critical milestones
Aerial view of CIL plant infrastructure and integration with existing facilities
Project documentation and technical materials